Arena Update
January 23, 2025
Substantial walk through of building was held today.
Work continuing to SAS tie into Zuni Canyon Rd.
ADA parking lot being prepped for asphalt.
Grandstands are being assembled.
Perimeter wire fencing to be installed on north side along Betty Dr.